testing
-
KEN'S KORNER - Disaster Recovery Planning
Disaster Recovery Planning Click here to view, print and share a pdf of this article. The average cost of an unplanned data center outage is $7,900 per minute, a 41% increase since 2010. The average outage lasted 86 minutes resulting in an average cost per incident of $690,000. Ponemon Institute: 2013 Study on Data Center Outages With data center downtime... -
KEN'S KORNER - Improved Cable Management
12 Tips for Improved Data Center Cable Management For many data centers managing cables is an afterthought. Not having a plan or scheme in place prior to running cables, makes troubleshooting problems difficult. Companies should develop cable management plans and guidelines prior to any cable installation. There are a number of low cost, easy to implement cable management solutions for... -
KEN'S KORNER - UPS System Preventative Maintenance
UPS Systems & Preventative Maintenance An uninterruptable power supply (UPS) is designed to provide emergency power to electrical equipment when the primary power source fails. A UPS typically serves as a bridge between the primary power source and an auxiliary power system, like a diesel generator, to provide time to properly shut down sensitive equipment. A UPS can either... -
KEN'S KORNER - Generator and Stored Fuel
Back-up Diesel Generators and Stored Fuel The importance of diesel generators is well known by the facilities and IT personnel of a data center, especially in the event of a power failure. Due to this fact, much emphasis and resources are put into the generator's physical maintenance, but - much too often a very important factor is neglected, the on-site...