24 Hour Turn

Meeting our Customers Needs

When you need a PDU Whip on site for installation quickly, turn to PDU Cables.  PDU Cables is known for its quick turnaround and prompt delivery, with most cable orders built and shipped within 24 hours.  Our quick turn philosophy, with attention to detail, has helped many data center professionals meet tight deadlines.  Being centrally located in Minnesota, most cable orders arrive within one-to-three days from the ship date.  And in those rare cases expedited shipping is available as well. 

 

How Does PDU Cables Do It?

PDU Cables priority is to provide the highest quality power cables with the fastest delivery possible.  To accomplish this, PDU Cables has a large staff of trained assemblers managed by leads and supervisors experienced in the manufacturing process, aided by a set of process controls designed to ensure that tasks are performed correctly, completely and efficiently, the first time every time. 

 

To accomplish our quick turn goals, PDU Cables maintains 30 days’ supply of inventory, much of it on consignment.  Our purchasing department and inventory control specialists oversee our ongoing materials needs and maintain contact with dozens of vendors and re-order supplies daily.

 

Within our 86,000 square foot facility, PDU Cables operates two production lines over two shifts.  The different lines are oriented to accommodate both large and small orders, allowing us to isolate unique orders and still achieve a quick turn.  Maintaining extensive inventory and having an automated manufacturing process allows PDU Cables to keep manufacturing power whips all night long without any worries about parts, tools or quality issues.  

 

For orders received after our shipping carrier cutoffs, we use our second shift to manufacture cables throughout the night and have them ready to ship first thing the next morning.  This frees up capacity during the day to accept, manufacture and ship more orders the same day, including orders received only a couple of hours before the shipping cutoffs.  Having this built in quick turn capacity to handle smaller orders on short notice has helped out numerous data centers provide power to last minute equipment installations.     

 

Even with this quick turn philosophy, PDU Cables stringent process controls ensure each cable is tested, labeled, and cleaned prior to packaging, allowing us to achieve an incredible 99.8% on-time delivery. 

 

Our ability to produce UL listed, 100% tested power whips with such short lead times is one reasons why so many data centers and electrical contractors have chosen to have PDU Cables supply their power distribution cables instead of manufacturing it themselves. 

 

Fast Delivery, Our preferred Carriers

 

 

 

Track your delivery from

FedEx

Fedex shipping delivery times range from 1 to 3 days  

Track your delivery from

UPS

UPS standard delivery ranges from 1 to 5 days