{"title":"Temporary Lighting For Data Center Construction","description":null,"products":[{"product_id":"tigress-prefab-temporary-led-light-fixture-with-cords","title":"TIGRESS Prefab Temporary LED Light Fixture with Cords","description":"\u003cul\u003e\n\u003cli\u003ePrewired for Fast Installation: Prefab design with 12\/3 cord, NEMA plug, and carabiner eliminates field wiring and cuts setup time.\u003c\/li\u003e\n\u003cli\u003eDaisy-Chainable for Scalable Coverage: Easily link multiple fixtures for consistent lighting across large jobsites and long runs.\u003c\/li\u003e\n\u003cli\u003eJobsite-Tough Durability: Stainless steel cage and rugged construction built to withstand demanding construction environments.\u003c\/li\u003e\n\u003cli\u003eLabor-Saving, High-Efficiency Performance: Bright LED output reduces energy use while prefab configuration speeds deployment and lowers labor costs.\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"EPCO","offers":[{"title":"TIGRESS Prefab 100W: 1-FT 5-15P Cord and 1-FT 5-15R Cord","offer_id":53453243613478,"sku":"P\/N 15742-12A1-P1R1","price":1.0,"currency_code":"USD","in_stock":true},{"title":"TIGRESS Prefab 100W: 6-FT 5-15P Cord and 1-FT 5-15R Cord","offer_id":53453243646246,"sku":"P\/N 15742-12A1-P6R1","price":1.0,"currency_code":"USD","in_stock":true},{"title":"TIGRESS Prefab 100W: 25-FT 5-15P Cord and 1-FT 5-15R Cord","offer_id":53453243679014,"sku":"P\/N 15742-12A1-P25R1","price":1.0,"currency_code":"USD","in_stock":true},{"title":"TIGRESS Prefab 100W: 35-FT 5-15P Cord and 1-FT 5-15R Cord","offer_id":53453243711782,"sku":"P\/N 15742-12A1-P35R1","price":1.0,"currency_code":"USD","in_stock":true},{"title":"TIGRESS Prefab 150W: 1-FT 5-15P Cord and 1-FT 5-15R Cord","offer_id":53453243744550,"sku":"P\/N 15743-12A1-P1R1","price":1.0,"currency_code":"USD","in_stock":true},{"title":"TIGRESS Prefab 150W: 6-FT 5-15P Cord and 1-FT 5-15R Cord","offer_id":53453243777318,"sku":"P\/N 15743-12A1-P6R1","price":1.0,"currency_code":"USD","in_stock":true},{"title":"TIGRESS Prefab 150W: 25-FT 5-15P Cord and 1-FT 5-15R Cord","offer_id":53453243810086,"sku":"P\/N 15743-12A1-P25R1","price":1.0,"currency_code":"USD","in_stock":true},{"title":"TIGRESS Prefab 150W: 35-FT 5-15P Cord and 1-FT 5-15R Cord","offer_id":53453243842854,"sku":"P\/N 15743-12A1-P35R1","price":1.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1004\/3021\/7510\/files\/Tigress_Prefab_with_Customizable_connectors.png?v=1785938357"}],"url":"https:\/\/www.pducables.com\/collections\/temporary-lighting-for-data-center-construction.oembed","provider":"PDU Cables","version":"1.0","type":"link"}